ITP
 is the minimum requirement of the activities for quality control and 
inspection of the field construction work. This Inspection and Testing 
Plan outline the extent of witness inspection and its reporting.
CONFLICTING REQUIREMENTS
Should conflicts exist between this specification and other documents, the following order of precedence shall govern:
- Scope of Work
 - Data Sheets
 - This Specification
 - Other Company Specification
 - Other Referenced Publications
 - Approved for Construction Drawings
 - Vendor’s Code
 
INSPECTION AND TEST PLAN REQUIREMENT
1.
 CONTRACTOR and/or its Vendor/Subcontractors shall prepare and execute 
all inspection and test. They shall conform to the above mentioned 
codes, standards, and project specifications.
2.
 CONTRACTOR and/or its Vendor/Subcontractors shall provide all 
inspection equipment for inspection activitie s. These activities are to
 assure themselves that adequate inspection personnel and back up 
equipment are in place in order to expedite their activities speedily so
 as not to impact on the construction schedule.
3.
 CONTRACTOR and/or its Vendor/Subcontractors shall prepare check sheets 
and inspection reports for carrying out the required quality control 
checks according to particular discipline work activities. All 
inspection and test reports forms shall be specific to the activity and 
items inspected.
4.
 CONTRACTOR shall also prepare a detailed inspection and test plan 
indicating inspection levels (spot witness, witness, hold point, etc), 
based on COMPANY definitions herein. The test inspection plan shall 
include witness/attendance requirements by COMPANY/MIGAS and/or THIRD 
PARTY.
5.
 Vendor or Subcontractor shall submit their inspection and test plan 
based on the CONTRACTOR’s inspection and test plan document for 
CONTRACTOR/COMPANY review and approval.
6.  CONTRACTOR
 shall generate, maintain, documented, and collate the inspection 
records, which is done by them or by its Vendor/Subcontractors. The 
system employed shall insure full tractability of records including back
 up in accordance to COMPANY requirements. CONTRACTOR shall submit the 
originals of all inspection data and other related documents to COMPANY,
 as required by the contract terms.
7.
 CONTRACTOR and its Third Party shall establish the inspection and test 
which are required for obtaining the SKPP (Sertifikat Kelayakan 
Penggunaan Peralatan) or Certificate of Worthiness to Utilize Equipment 
and SKPI (Sertifikat Kelayakan Penggunaan Instalasi) or Certificate of 
Worthiness to Utilize the Installation.