Teamwork ကို ခြဲၿခားေလ့လာရာတြင္
၁။ Responsibility - မိမိ တာ၀န္ယူရမည့္အပို္င္းကို တာ၀န္ယူၿခင္း၊ မိမိႏွင့္ လုပ္ေဖာ္ကိုင္ဖက္မ်ားအခ်င္းခ်င္း တာ၀န္ခြဲေ၀ယူေစၿခင္း
၂။ Respect - မိမိအလုပ္ကို အခ်ိန္ႏွင့္အမွ် ေလးစားၿခင္း၊ လုပ္ေဖာ္ကိုင္ဖက္အခ်င္းခ်င္းေလးစားၿခင္း
၃။ Understanding- မိမိအလုပ္အေၾကာင္း အၿပည့္အ၀နားလည္ေအာင္ၾကိဳးစားၿခင္း၊ မိမိလုပ္ေဖာ္ကိုင္ဖက္မ်ား၏ မိသားစုရိုးရာဓေလ့ ဘ၀အေၿခအေနမ်ားကို သိရွိနားလည္ေစရန္ ၾကိဳးစားၿခင္း
၄။ Communication- အခ်င္းခ်င္း အထက္ေအာက္ၿပန္လည္ သတင္းပို႕တင္ၿပၿခင္း၊ ၿဖစ္ေပၚလာႏုိင္ေသာ အက်ိဳးအေၾကာင္းမ်ားအား ေဆြးေႏြးဖလွယ္ ေလ့လာၿခင္း
၅။ Value - မိမိအလုပ္မွ မိမိလုပ္ေဖာ္ကိုင္ဖက္မ်ား ၾကီးငယ္မေရြး လုပ္ေဆာင္မွဳအေပၚ တန္ဖိုးထားၿခင္း၊ မိမိလုပ္ငန္းရည္ရြယ္ခ်က္ႏွင့္ တန္ဖိုး (Value) ကို လုပ္ေဖာ္ကိုင္ဖက္အခ်င္းခ်င္း သိရွိနားလည္ေအာင္ ၾကိဳးစားၿခင္း စသၿဖင့္ လက္ေတြ႕ခံယူက်င့္သံုးခဲ့ပါတယ္။
ဒါေၾကာင့္လည္း ၾကံဳေတြ႕လာေသာ အခက္အခဲမ်ားကို ေအာင္ေအာင္ၿမင္ၿမင္ ေက်ာ္လႊားႏုိင္ခဲ့ၿခင္း ၿဖစ္ပါတယ္။
Tuesday, 12 March 2013
Monday, 21 January 2013
PIPE WORK
WELDING WORK (HOT WORK)
NDT/RT/PT/MT
LINE CHECK (ISSUE PUNCH LIST)
CLEAR THE PUNCH LIST
PREPARE FOR HYDRO TEST
FLUSHING/BLOWING/PIGGING
N2 PACK
NDT/RT/PT/MT
LINE CHECK (ISSUE PUNCH LIST)
CLEAR THE PUNCH LIST
PREPARE FOR HYDRO TEST
FLUSHING/BLOWING/PIGGING
N2 PACK
Thursday, 10 January 2013
E. OTHERS
| 1 | Drawing attached to this checklist. | ||||||||||||||||||||||||||||||||
| 2 | Necessary photographs attached. |
|
|||||||||||||||||||||||||||||||
D. FINALIZING THE INSTALLATION
| 1 | Pipe properly labeled. | |||||||||||||
| 2 | Pipe properly insulated. | |||||||||||||
| 3 | Piping was isolated/blinded. | |||||||||||||
| 4 | Pipe protected from corrosion. | |||||||||||||
| 5 | Proper house keeping done. | |||||||||||||
| 6 | Log Out/Tack Out Procedure done. | |||||||||||||
| 7 | Appropriate permission to return line to service obtained. | |||||||||||||
C. INSTALLATION
| 1 | Pipes fittings completed. | ||||||||||||
| 2 | Pipe properly supported. | ||||||||||||
| 3 | Valves & components installed properly. | ||||||||||||
| 4 | Bolts & Nuts properly tighten. | ||||||||||||
| 5 | Valves & components operated/function properly. | ||||||||||||
| 6 | Pipe pressure/hydro test complete & acceptable. | ||||||||||||
| 7 | No leaking evident around fittings or components. | ||||||||||||
| 8 | Piping system properly flushed/cleaned. | ||||||||||||
Wednesday, 9 January 2013
B. PRE-INSTALLATION
| 1 | Line is new. | |||||||||||
| 2 | Line is re-used. | |||||||||||
| 3 | Drawings/Layouts submitted & approved. | |||||||||||
| 4 | Line tracing done. | |||||||||||
| 5 | Piping was flushed/cleaned. | |||||||||||
| 6 | Piping was isolated/blinded. | |||||||||||
| 7 | Log Out/Tack Out Procedure done. | |||||||||||
A. IDENTIFICATION
| Location of Installation: | Vopak Penjuru Terminal (from Berth-2 to Ex-Berth) | |||||||||||||||||||
| Line No.: | 6"-1025-SS103 | |||||||||||||||||||
| Material Spec.: | Stainless Steel 316L | |||||||||||||||||||
| Design Conditions: | Pressure: | 15.0 Bar | ||||||||||||||||||
| Temperature: | 110 Degree C | |||||||||||||||||||
Subscribe to: