B. PRE-INSTALLATION
1
Line is new.
2
Line is re-used.
3
Drawings/Layouts submitted & approved.
4
Line tracing done.
5
Piping was flushed/cleaned.
6
Piping was isolated/blinded.
7
Log Out/Tack Out Procedure done.