Peaking procedure

Peaking procedure:
1. Prepare a horizontal weep board 900 mm long. The sweep board shall made to the nominal radius of the tank.
2. Take a sample of vertical joint at least 4 point.
3. Measure the deviations using a taper gauge.
4. Deviations at vertical weld joint shall not exceed 13 mm
Banding procedure:
1. Prepare a a straight edge vertical sweep board 900 mm.
2. Take a sample of horizontal joint at least 4 point.
3. Measure the deviations using a taper gauge.
4. Deviations at vertical weld joint shall not exceed 13 mm