CONNECT BACK 10NO OF PRODUCT LINES
CONNECT BACK UTILITIES LINES
TESTING OF PIPE LINES
PIGGING OF PIPE LINES
PIPE GROUTING, GUIDE, ANCHORING
RE-CALIBRATION OF PIPE LINES
PAINTING
SURVEY
REMOVAL OF PIPE STRUCTURAL BUNDLE AFTER TIE-IN OF NEWS LINES ON STRUCTURE
DISMANTLE AND REMOVE
HYDRO TEST
FLUSHING
PIGGING
N2 PACK
PIGGING REPORT ASK VOPAK TO SIGN
HYDRO TEST REPORT ASK VOPAK TO SIGN
TO HAVE FAST PROGRESS -
CHECK WITH QC -
WHICH PIPE LINES IS X RAY PASS
LINE CLEAR (EARTH LUG, ANCHOR POINT)
MUST KNOW WHAT LINE IS WHAT PRODUCT
VAPOUR LINE MORE DANGEROUS, WHEN REACH FLASH POINT-PIPE EXPLODE
OLD USED PIPE - BEFORE CUT - AIR BLOW WHOLE NIGHT, N2 PURGE
USE LONG ELBOW EASY TO PIGGING - FOR PRODUCT PIPE LINES
HYDRO TEST
USE ELECTRICAL PUMP - HOT WORK PERMIT
USE PNEUMATIC PUMP - COLD WORK PERMIT
USE FIRE HYDRANT LINES - OFF JOCKY PUMP ALARM, JETTY PUMP OFF
FILL WATER FROM LOWEST POINT
RELEASE AIR FROM HIGHEST POINT
AFTER HYDRO TEST- RELEASE PRESSURE TO ZERO
CLEAN RESIDUAL WATER WITH BRUSH PIG, THEN FOLLOW BY SPUNCH PIG
TO ENSURE WORK ARE CARRIED OUT SAFELY WITH GOOD QUALITY AND WITHIN BUDGET.
Thursday, 13 December 2012
Tuesday, 13 November 2012
CHECKING PROGRESS DESIGN & ENGINEERING
tank body design calculation
column calculation
spiral stairway & platform calculation
tank loading data
general assembly
shell plate details
tank orientation
detail of men hole
nozzle details
column & column stub
column bracing
stairway layout
stairway details
details of platform
water spray system
detail of name plate
fire protection for column
details of pipe supports
column calculation
spiral stairway & platform calculation
tank loading data
general assembly
shell plate details
tank orientation
detail of men hole
nozzle details
column & column stub
column bracing
stairway layout
stairway details
details of platform
water spray system
detail of name plate
fire protection for column
details of pipe supports
SPHERICAL TANK
Shell Plate - Top Crown | ||||
Shell Plate - Upper Temperate | ||||
Shell Plate - Equator | ||||
Shell Plate - Lower Temperate | ||||
Shell Plate - Bottom Crown | ||||
Column Stub & Cap | ||||
Lower Column Support | ||||
Base & Wind Plate | ||||
Bracing | ||||
Spiral Stairway & Top Platform | ||||
Nozzles & Manholes | ||||
Internal Pipe & Support | ||||
Misc. Material |
SITE ERECTED TANK
Shell - Course No. 1 | ||||
Shell - Course No. 2 | ||||
Shell - Course No. 3 | ||||
Shell - Course No. 4 | ||||
Shell - Course No. 5 | ||||
Shell - Course No. 6 | ||||
Bottom Plate | ||||
Roof Plate | ||||
Top Angle | ||||
Roof Structure & Rafter | ||||
Manhole & Nozzle | ||||
Roof Handrail | ||||
Spiral Stairway | ||||
Insulation & Pipe Support | ||||
Accessories & Misc. Materials |
CHECKING PROGRESS
design and engineering
material procurement
shop fabrication
transportation/logistics
field erection
water sprinkler system
scaffolding
testing
3rd party inspection
column fire proofing
tank calibration
tank insulation
preliminaries & administration
basic contract
change order
material procurement
shop fabrication
transportation/logistics
field erection
water sprinkler system
scaffolding
testing
3rd party inspection
column fire proofing
tank calibration
tank insulation
preliminaries & administration
basic contract
change order
Monday, 22 October 2012
CONSTRUCTION JOBS
ENGINEERING
drawing hard copy to filed
drawing hard copy to pass contractor
mark up of design changes/as built
SITE ADMINISTRATION
stationary
petty cash
temp.facilities (office,internet,electricity,etc.)
site pantry (water,refreshment,grocery)
site pass
document submission
facilities maintenance
consumable (diesel,waste bin,toilet)
SAFETY
oshas 18001 maintenance
soc/sic
safety training
permit to work
safety checklist
safety barricade/signage
ppe
toolbox/WSH meeting
safety promotion
confined space accessor
work at height supervisor
PROJECT MANAGEMENT
iso 9001 maintence
daily report
weekly report
monthly report
purchase requisition
material take-off/ check materials for upcoming activities
insurance/workmen's compensation
procedure preparation
procedure submission/issuance
procedure control/documentation
coordination with vendor/supplier
schedule
progress meeting
TRANSPORTATION & MATERIAL CONTROL
crane,lorry,hiap crane arrangement
delivery order
receiving materials
issuance of materials
material gate pass
stock/inventory control
permanent material arrangement
FIELD CONSTRUCTION
MSRA preparation
msra submission/issuance
msra control/documentation
supervision
coordination
clearing of punch items
status update/progress report
motivation/appreciation
construction schedule
construction meeting
QA/QC
ITP control/documentation
request for inspection
NDE arrangement
consumable (marker,nde cosumable,etc.)
inspection
PQR/WPS/WQT preparation
PQR/WPS/WQT issuance/submission
PQR/WPS/WQT control/documentation
RT film control
inspection progress reporting
inspection report documentation
drawing hard copy to filed
drawing hard copy to pass contractor
mark up of design changes/as built
SITE ADMINISTRATION
stationary
petty cash
temp.facilities (office,internet,electricity,etc.)
site pantry (water,refreshment,grocery)
site pass
document submission
facilities maintenance
consumable (diesel,waste bin,toilet)
SAFETY
oshas 18001 maintenance
soc/sic
safety training
permit to work
safety checklist
safety barricade/signage
ppe
toolbox/WSH meeting
safety promotion
confined space accessor
work at height supervisor
PROJECT MANAGEMENT
iso 9001 maintence
daily report
weekly report
monthly report
purchase requisition
material take-off/ check materials for upcoming activities
insurance/workmen's compensation
procedure preparation
procedure submission/issuance
procedure control/documentation
coordination with vendor/supplier
schedule
progress meeting
TRANSPORTATION & MATERIAL CONTROL
crane,lorry,hiap crane arrangement
delivery order
receiving materials
issuance of materials
material gate pass
stock/inventory control
permanent material arrangement
FIELD CONSTRUCTION
MSRA preparation
msra submission/issuance
msra control/documentation
supervision
coordination
clearing of punch items
status update/progress report
motivation/appreciation
construction schedule
construction meeting
QA/QC
ITP control/documentation
request for inspection
NDE arrangement
consumable (marker,nde cosumable,etc.)
inspection
PQR/WPS/WQT preparation
PQR/WPS/WQT issuance/submission
PQR/WPS/WQT control/documentation
RT film control
inspection progress reporting
inspection report documentation
Monday, 17 September 2012
ကြ်ႏု္ပ္တုိ႔၏ဘ၀ တုိးတက္ေကာင္းမြန္ရန္
ကြ်ႏု္ပ္တုိ႔၏ဘ၀ တုိးတက္ေကာင္းမြန္ရန္ အတြက္ အနည္းဆုံး ေအာက္ပါ အခ်က္ အခ်ဳိ႕လုိ အပ္သည္ဟု ကြ်ႏု္ပ္မွခံစား ယုံၾကည္ မိပါသည္။
၁။ ကုိယ္က်င့္တရားေကာင္မြန္မႈ
၂။ ရုိးသားျဖဴစင္မႈ
၃။ စြန္႔လြတ္အနစ္နာခံႏုိင္မႈ
၄။ အခ်ိန္ကုိ တန္ဖုိးထားေလးစားမႈ
၅။ ေလ့လာမွတ္သား သင္ယူမႈ
၆။ ေ၀ဖန္ေထာက္ျပဆန္းစစ္မႈ
၇။ လက္ရွိအေျခအေနအေပၚ သုံးသပ္ဆုံးျဖတ္နုိင္မႈ
၈။ သေဘာထား ရပ္တည္မႈ
၉။ အေကာင္အထည္ေဖၚလုိက္နာက်င့္သုံးမႈ
၁၀။ အဖြဲ႔အစည္းစိတ္ဓါတ္
၁။ ကုိယ္က်င့္တရားေကာင္မြန္မႈ
၂။ ရုိးသားျဖဴစင္မႈ
၃။ စြန္႔လြတ္အနစ္နာခံႏုိင္မႈ
၄။ အခ်ိန္ကုိ တန္ဖုိးထားေလးစားမႈ
၅။ ေလ့လာမွတ္သား သင္ယူမႈ
၆။ ေ၀ဖန္ေထာက္ျပဆန္းစစ္မႈ
၇။ လက္ရွိအေျခအေနအေပၚ သုံးသပ္ဆုံးျဖတ္နုိင္မႈ
၈။ သေဘာထား ရပ္တည္မႈ
၉။ အေကာင္အထည္ေဖၚလုိက္နာက်င့္သုံးမႈ
၁၀။ အဖြဲ႔အစည္းစိတ္ဓါတ္
Friday, 14 September 2012
OUR HABITS | ||
BAD leader | GOOD leader | |
private victory | ||
1 | react | be proactive |
2 | begin with no end in mind | begin with end in mind |
3 | do first thing last | do first thing first |
public victory | ||
4 | think win-lose | think win - win |
5 | seek first to talk, then pretend to listen | seek first to understand, then to be understood |
6 | compete/compare/don’t cooperate | synergy |
selfrenewal | ||
7 | wear ourself out | sharpen the saw |
Wednesday, 12 September 2012
Supervision work for tank erection
Check drawing and check materials list, material take-off
check materials for upcoming activities
check materials for upcoming activities
check when material deliver to site
check men power production welder,fitter,grinder,helper,lifting crew
check men power production welder,fitter,grinder,helper,lifting crew
Monitor work progress , welding
progress
record down daily progress
Support workforce to speed up
Find the reason why progress is slow
and report to manager
လုပ္ငန္း ကို အစမွ အဆံုးတိုင္
အရည္အေသြး ရွိမႈ ဆိုသည္မွာ -
လုပ္ငန္း ကို အစမွ အဆံုးတိုင္ သိျမင္
နားလည္ၿပီး ျပႆနာမ်ား ကို ေျဖရွင္း ႏိုင္ျခင္း ျဖစ္သည္။
နားလည္ၿပီး ျပႆနာမ်ား ကို ေျဖရွင္း ႏိုင္ျခင္း ျဖစ္သည္။
ႀကိဳးစား အားထုတ္မႈ -
ဆိုသည္မွာ အလုပ္ကို စြမ္းစြမ္း တမံ လုပ္ေဆာင္၍ အလုပ္ မ်ားမ်ား လုပ္သည္ႏွင့္
အမွ် မ်ားမ်ား တတ္ကြ်မ္း လာျခင္း ျဖစ္သည္။
ဆိုသည္မွာ အလုပ္ကို စြမ္းစြမ္း တမံ လုပ္ေဆာင္၍ အလုပ္ မ်ားမ်ား လုပ္သည္ႏွင့္
အမွ် မ်ားမ်ား တတ္ကြ်မ္း လာျခင္း ျဖစ္သည္။
စည္းလံုး ညီၫြတ္မႈ ဆိုသည္မွာ အျခား -
သူမ်ား ႏွင့္ လိုလို လားလား ပူးေပါင္း ေဆာင္ရြက္ ရန္ အသင့္ရွိၿပီး
သိသင့္သည္မ်ား ကို တကယ္ လည္း သိေအာင္ သတင္း ဖလွယ္ျခင္းတို႔ ျဖစ္ သည္။
သူမ်ား ႏွင့္ လိုလို လားလား ပူးေပါင္း ေဆာင္ရြက္ ရန္ အသင့္ရွိၿပီး
သိသင့္သည္မ်ား ကို တကယ္ လည္း သိေအာင္ သတင္း ဖလွယ္ျခင္းတို႔ ျဖစ္ သည္။
မည္သည့္ အဖြဲ႕အစည္းတြင္ မဆို ရင္းျမစ္
ပိုင္ဆိုင္မႈမ်ား ရွိသည္။
ပိုင္ဆိုင္သည့္ ရင္းျမစ္ ငါးမ်ိဳးမွာ ေငြေၾကး၊ လူသား အရင္းအျမစ္မ်ား၊ ရရန
္အေၾကြးမ်ား၊ သတင္းမ်ား ႏွင့္ အတတ္ပညာ ဆိုင္ရာ ပစၥည္း ဥစၥာမ်ား ျဖစ္သည္။
ေခါင္းေဆာင္၏ တတိယ အလုပ္မွာ ကုမၸဏီ ၏ ပိုင္ဆိုင္မႈ ရင္းျမစ္မ်ားက
စီမံခန္႔ခြဲေရး ပင္ ျဖစ္သည္။ ဤသည္မွာ ေခါင္းေဆာင္၏ အေရးႀကီးဆံုး တာဝန္ ျဖစ္သည္။
ေခါင္းေဆာင္ သည္ သူ ကြ်မ္းက်င္သည့္ လုပ္ငန္းကို ကိုယ္တိုင္ လုပ္ရန္ မဟုတ္ဘဲ
စီမံ ခန္႔ခြဲ ရန္သာ ျဖစ္သည္။
ပိုင္ဆိုင္သည့္ ရင္းျမစ္ ငါးမ်ိဳးမွာ ေငြေၾကး၊ လူသား အရင္းအျမစ္မ်ား၊ ရရန
္အေၾကြးမ်ား၊ သတင္းမ်ား ႏွင့္ အတတ္ပညာ ဆိုင္ရာ ပစၥည္း ဥစၥာမ်ား ျဖစ္သည္။
ေခါင္းေဆာင္၏ တတိယ အလုပ္မွာ ကုမၸဏီ ၏ ပိုင္ဆိုင္မႈ ရင္းျမစ္မ်ားက
စီမံခန္႔ခြဲေရး ပင္ ျဖစ္သည္။ ဤသည္မွာ ေခါင္းေဆာင္၏ အေရးႀကီးဆံုး တာဝန္ ျဖစ္သည္။
ေခါင္းေဆာင္ သည္ သူ ကြ်မ္းက်င္သည့္ လုပ္ငန္းကို ကိုယ္တိုင္ လုပ္ရန္ မဟုတ္ဘဲ
စီမံ ခန္႔ခြဲ ရန္သာ ျဖစ္သည္။
Project Knowledge
Observe Hazard analysis and Risk
Assessments with regards to the Safety issues.
Enforcing and implementing the
Safe working procedures at site.
Accompanied in the Weekly Planned Group
Inspections conducted by the clients.
Develop the Safe Working procedures for
all items of work with reference to method Statement.
Arranging the method
Statement for the Safety Group meetings with the Sub Contractors.
Advice the
site management employees on Health, ...
keep monitoring safety activities
You will be based at site and you will be required to meet certain deadlines, as well as liaise with various sub contractors, and coordination on different aspects of the project. Coordination on the site activities, construction and subcontractor. Preparing and Arranging of Panel Data to be submitted to Client. Ma .. in accordance with applicable code/standard, engineering guides, specification and government regulation. Inspect for any deviation and take necessary corrective action in term of repair recommendation, record /file properly. Ensure all civil and structural work comply with the ... He/She shall have a minimum of ten (10) years experience in offshore, oil and gas production facilities of which the last three (3) years must have been in commissioning superintendent role during which time he/she has been leading commissioning activities of major offshore oil and gas projects. ... Assist Project Manager in planning and execution of project plans at site. Liaison with all parties involved in the project including local authorities, consultants, clients, subcontractors and suppliers. Attend site meetings and inspections, report regularly on progress and monitor schedule. Prepare and monitor work schedules, project costing, procurement, and coordination with all partied involved to ensure work progress smoothly and complet ...
|