1 | Line is new. | |||||||||||
2 | Line is re-used. | |||||||||||
3 | Drawings/Layouts submitted & approved. | |||||||||||
4 | Line tracing done. | |||||||||||
5 | Piping was flushed/cleaned. | |||||||||||
6 | Piping was isolated/blinded. | |||||||||||
7 | Log Out/Tack Out Procedure done. |
Wednesday, 9 January 2013
B. PRE-INSTALLATION
A. IDENTIFICATION
Location of Installation: | Vopak Penjuru Terminal (from Berth-2 to Ex-Berth) | |||||||||||||||||||
Line No.: | 6"-1025-SS103 | |||||||||||||||||||
Material Spec.: | Stainless Steel 316L | |||||||||||||||||||
Design Conditions: | Pressure: | 15.0 Bar | ||||||||||||||||||
Temperature: | 110 Degree C |
Thursday, 13 December 2012
VOAPK PIPE INSTALLATION WORK
CONNECT BACK 10NO OF PRODUCT LINES
CONNECT BACK UTILITIES LINES
TESTING OF PIPE LINES
PIGGING OF PIPE LINES
PIPE GROUTING, GUIDE, ANCHORING
RE-CALIBRATION OF PIPE LINES
PAINTING
SURVEY
REMOVAL OF PIPE STRUCTURAL BUNDLE AFTER TIE-IN OF NEWS LINES ON STRUCTURE
DISMANTLE AND REMOVE
HYDRO TEST
FLUSHING
PIGGING
N2 PACK
PIGGING REPORT ASK VOPAK TO SIGN
HYDRO TEST REPORT ASK VOPAK TO SIGN
TO HAVE FAST PROGRESS -
CHECK WITH QC -
WHICH PIPE LINES IS X RAY PASS
LINE CLEAR (EARTH LUG, ANCHOR POINT)
MUST KNOW WHAT LINE IS WHAT PRODUCT
VAPOUR LINE MORE DANGEROUS, WHEN REACH FLASH POINT-PIPE EXPLODE
OLD USED PIPE - BEFORE CUT - AIR BLOW WHOLE NIGHT, N2 PURGE
USE LONG ELBOW EASY TO PIGGING - FOR PRODUCT PIPE LINES
HYDRO TEST
USE ELECTRICAL PUMP - HOT WORK PERMIT
USE PNEUMATIC PUMP - COLD WORK PERMIT
USE FIRE HYDRANT LINES - OFF JOCKY PUMP ALARM, JETTY PUMP OFF
FILL WATER FROM LOWEST POINT
RELEASE AIR FROM HIGHEST POINT
AFTER HYDRO TEST- RELEASE PRESSURE TO ZERO
CLEAN RESIDUAL WATER WITH BRUSH PIG, THEN FOLLOW BY SPUNCH PIG
TO ENSURE WORK ARE CARRIED OUT SAFELY WITH GOOD QUALITY AND WITHIN BUDGET.
CONNECT BACK UTILITIES LINES
TESTING OF PIPE LINES
PIGGING OF PIPE LINES
PIPE GROUTING, GUIDE, ANCHORING
RE-CALIBRATION OF PIPE LINES
PAINTING
SURVEY
REMOVAL OF PIPE STRUCTURAL BUNDLE AFTER TIE-IN OF NEWS LINES ON STRUCTURE
DISMANTLE AND REMOVE
HYDRO TEST
FLUSHING
PIGGING
N2 PACK
PIGGING REPORT ASK VOPAK TO SIGN
HYDRO TEST REPORT ASK VOPAK TO SIGN
TO HAVE FAST PROGRESS -
CHECK WITH QC -
WHICH PIPE LINES IS X RAY PASS
LINE CLEAR (EARTH LUG, ANCHOR POINT)
MUST KNOW WHAT LINE IS WHAT PRODUCT
VAPOUR LINE MORE DANGEROUS, WHEN REACH FLASH POINT-PIPE EXPLODE
OLD USED PIPE - BEFORE CUT - AIR BLOW WHOLE NIGHT, N2 PURGE
USE LONG ELBOW EASY TO PIGGING - FOR PRODUCT PIPE LINES
HYDRO TEST
USE ELECTRICAL PUMP - HOT WORK PERMIT
USE PNEUMATIC PUMP - COLD WORK PERMIT
USE FIRE HYDRANT LINES - OFF JOCKY PUMP ALARM, JETTY PUMP OFF
FILL WATER FROM LOWEST POINT
RELEASE AIR FROM HIGHEST POINT
AFTER HYDRO TEST- RELEASE PRESSURE TO ZERO
CLEAN RESIDUAL WATER WITH BRUSH PIG, THEN FOLLOW BY SPUNCH PIG
TO ENSURE WORK ARE CARRIED OUT SAFELY WITH GOOD QUALITY AND WITHIN BUDGET.
Tuesday, 13 November 2012
CHECKING PROGRESS DESIGN & ENGINEERING
tank body design calculation
column calculation
spiral stairway & platform calculation
tank loading data
general assembly
shell plate details
tank orientation
detail of men hole
nozzle details
column & column stub
column bracing
stairway layout
stairway details
details of platform
water spray system
detail of name plate
fire protection for column
details of pipe supports
column calculation
spiral stairway & platform calculation
tank loading data
general assembly
shell plate details
tank orientation
detail of men hole
nozzle details
column & column stub
column bracing
stairway layout
stairway details
details of platform
water spray system
detail of name plate
fire protection for column
details of pipe supports
SPHERICAL TANK
Shell Plate - Top Crown | ||||
Shell Plate - Upper Temperate | ||||
Shell Plate - Equator | ||||
Shell Plate - Lower Temperate | ||||
Shell Plate - Bottom Crown | ||||
Column Stub & Cap | ||||
Lower Column Support | ||||
Base & Wind Plate | ||||
Bracing | ||||
Spiral Stairway & Top Platform | ||||
Nozzles & Manholes | ||||
Internal Pipe & Support | ||||
Misc. Material |
SITE ERECTED TANK
Shell - Course No. 1 | ||||
Shell - Course No. 2 | ||||
Shell - Course No. 3 | ||||
Shell - Course No. 4 | ||||
Shell - Course No. 5 | ||||
Shell - Course No. 6 | ||||
Bottom Plate | ||||
Roof Plate | ||||
Top Angle | ||||
Roof Structure & Rafter | ||||
Manhole & Nozzle | ||||
Roof Handrail | ||||
Spiral Stairway | ||||
Insulation & Pipe Support | ||||
Accessories & Misc. Materials |
CHECKING PROGRESS
design and engineering
material procurement
shop fabrication
transportation/logistics
field erection
water sprinkler system
scaffolding
testing
3rd party inspection
column fire proofing
tank calibration
tank insulation
preliminaries & administration
basic contract
change order
material procurement
shop fabrication
transportation/logistics
field erection
water sprinkler system
scaffolding
testing
3rd party inspection
column fire proofing
tank calibration
tank insulation
preliminaries & administration
basic contract
change order