Tuesday 13 November 2012

CHECKING PROGRESS DESIGN & ENGINEERING

tank body design calculation
column calculation
spiral stairway & platform calculation
tank loading data
general assembly
shell plate details
tank orientation
detail of men hole
nozzle details
column & column stub
column bracing
stairway layout
stairway details
details of platform
water spray system
detail of name plate
fire protection for column
details of pipe supports

SPHERICAL TANK


Shell Plate - Top Crown
Shell Plate - Upper Temperate
Shell Plate - Equator
Shell Plate - Lower Temperate  
Shell Plate - Bottom Crown
Column Stub & Cap
Lower Column Support
Base & Wind Plate
Bracing
Spiral Stairway & Top Platform
Nozzles & Manholes    
Internal Pipe & Support    
Misc. Material

SITE ERECTED TANK


Shell - Course No. 1 
Shell - Course No. 2
Shell - Course No. 3 
Shell - Course No. 4
Shell - Course No. 5 
Shell - Course No. 6 
Bottom Plate
Roof Plate
Top Angle 
Roof Structure & Rafter
Manhole & Nozzle
Roof Handrail
Spiral Stairway
Insulation & Pipe Support
Accessories & Misc. Materials

CHECKING PROGRESS

design and engineering
material procurement
shop fabrication
transportation/logistics
field erection
water sprinkler system
scaffolding
testing
3rd party inspection
column fire proofing
tank calibration
tank insulation
preliminaries & administration
basic contract
change order