Thursday 13 December 2012

VOAPK PIPE INSTALLATION WORK

CONNECT BACK 10NO OF PRODUCT LINES
CONNECT BACK UTILITIES LINES
TESTING OF PIPE LINES
PIGGING OF PIPE LINES
PIPE GROUTING, GUIDE, ANCHORING
RE-CALIBRATION OF PIPE LINES
PAINTING
SURVEY
REMOVAL OF PIPE STRUCTURAL BUNDLE AFTER TIE-IN OF NEWS LINES ON STRUCTURE
DISMANTLE AND REMOVE

HYDRO TEST
FLUSHING
PIGGING
N2 PACK

PIGGING REPORT ASK VOPAK TO SIGN
HYDRO TEST REPORT ASK VOPAK TO SIGN

TO HAVE FAST PROGRESS -
CHECK WITH QC -
WHICH PIPE LINES IS X RAY PASS
LINE CLEAR (EARTH LUG, ANCHOR POINT)

MUST KNOW WHAT LINE IS WHAT PRODUCT
VAPOUR LINE MORE DANGEROUS, WHEN REACH FLASH POINT-PIPE EXPLODE
OLD USED PIPE - BEFORE CUT - AIR BLOW WHOLE NIGHT, N2 PURGE
USE LONG ELBOW EASY TO PIGGING - FOR PRODUCT PIPE LINES

HYDRO TEST
USE ELECTRICAL PUMP - HOT WORK PERMIT
USE PNEUMATIC PUMP - COLD WORK PERMIT
USE FIRE HYDRANT LINES - OFF JOCKY PUMP ALARM, JETTY PUMP OFF
FILL WATER FROM LOWEST POINT
RELEASE AIR FROM HIGHEST POINT
AFTER HYDRO TEST- RELEASE PRESSURE TO ZERO
CLEAN RESIDUAL WATER WITH BRUSH PIG, THEN FOLLOW BY SPUNCH PIG
TO ENSURE WORK ARE CARRIED OUT SAFELY WITH GOOD QUALITY AND WITHIN BUDGET.


Tuesday 13 November 2012

CHECKING PROGRESS DESIGN & ENGINEERING

tank body design calculation
column calculation
spiral stairway & platform calculation
tank loading data
general assembly
shell plate details
tank orientation
detail of men hole
nozzle details
column & column stub
column bracing
stairway layout
stairway details
details of platform
water spray system
detail of name plate
fire protection for column
details of pipe supports

SPHERICAL TANK


Shell Plate - Top Crown
Shell Plate - Upper Temperate
Shell Plate - Equator
Shell Plate - Lower Temperate  
Shell Plate - Bottom Crown
Column Stub & Cap
Lower Column Support
Base & Wind Plate
Bracing
Spiral Stairway & Top Platform
Nozzles & Manholes    
Internal Pipe & Support    
Misc. Material

SITE ERECTED TANK


Shell - Course No. 1 
Shell - Course No. 2
Shell - Course No. 3 
Shell - Course No. 4
Shell - Course No. 5 
Shell - Course No. 6 
Bottom Plate
Roof Plate
Top Angle 
Roof Structure & Rafter
Manhole & Nozzle
Roof Handrail
Spiral Stairway
Insulation & Pipe Support
Accessories & Misc. Materials

CHECKING PROGRESS

design and engineering
material procurement
shop fabrication
transportation/logistics
field erection
water sprinkler system
scaffolding
testing
3rd party inspection
column fire proofing
tank calibration
tank insulation
preliminaries & administration
basic contract
change order

Monday 22 October 2012

CONSTRUCTION JOBS

ENGINEERING
drawing hard copy to filed
drawing hard copy to pass contractor
mark up of design changes/as built

SITE ADMINISTRATION
stationary
petty cash
temp.facilities (office,internet,electricity,etc.)
site pantry (water,refreshment,grocery)
site pass
document submission
facilities maintenance
consumable (diesel,waste bin,toilet)

SAFETY
oshas 18001 maintenance
soc/sic
safety training
permit to work
safety checklist
safety barricade/signage
ppe
toolbox/WSH meeting
safety promotion
confined space accessor
work at height supervisor

PROJECT MANAGEMENT
iso 9001 maintence
daily report
weekly report
monthly report
purchase requisition
material take-off/ check materials for upcoming activities
insurance/workmen's compensation
procedure preparation
procedure submission/issuance
procedure control/documentation
coordination with vendor/supplier
schedule
progress meeting

TRANSPORTATION & MATERIAL CONTROL
crane,lorry,hiap crane arrangement
delivery order
receiving materials
issuance of materials
material gate pass
stock/inventory control
permanent material arrangement

FIELD CONSTRUCTION
MSRA preparation
msra submission/issuance
msra control/documentation
supervision
coordination
clearing of punch items
status update/progress report
motivation/appreciation
construction schedule
construction meeting

QA/QC
ITP control/documentation
request for inspection
NDE arrangement
consumable (marker,nde cosumable,etc.)
inspection
PQR/WPS/WQT preparation
PQR/WPS/WQT issuance/submission
PQR/WPS/WQT control/documentation
RT film control
inspection progress reporting
inspection report documentation

Monday 17 September 2012

ကြ်ႏု္ပ္တုိ႔၏ဘ၀ တုိးတက္ေကာင္းမြန္ရန္

ကြ်ႏု္ပ္တုိ႔၏ဘ၀ တုိးတက္ေကာင္းမြန္ရန္ အတြက္ အနည္းဆုံး ေအာက္ပါ အခ်က္ အခ်ဳိ႕လုိ အပ္သည္ဟု ကြ်ႏု္ပ္မွခံစား ယုံၾကည္ မိပါသည္။

၁။ ကုိယ္က်င့္တရားေကာင္မြန္မႈ
၂။ ရုိးသားျဖဴစင္မႈ
၃။ စြန္႔လြတ္အနစ္နာခံႏုိင္မႈ
၄။ အခ်ိန္ကုိ တန္ဖုိးထားေလးစားမႈ
၅။ ေလ့လာမွတ္သား သင္ယူမႈ
၆။ ေ၀ဖန္ေထာက္ျပဆန္းစစ္မႈ
၇။ လက္ရွိအေျခအေနအေပၚ သုံးသပ္ဆုံးျဖတ္နုိင္မႈ
၈။ သေဘာထား ရပ္တည္မႈ
၉။ အေကာင္အထည္ေဖၚလုိက္နာက်င့္သုံးမႈ
၁၀။ အဖြဲ႔အစည္းစိတ္ဓါတ္

Friday 14 September 2012

 
  OUR HABITS
  BAD leader GOOD leader
    private victory
1 react  be proactive
2 begin with no end in mind begin with end in mind
3 do first thing last do first thing first
     
    public victory
4 think win-lose think win - win
5 seek first to talk, then pretend to listen seek first to understand, then to be understood
6 compete/compare/don’t cooperate synergy
     
    selfrenewal
7 wear ourself out sharpen the saw
     

Wednesday 12 September 2012

Inspection knowledge



P : perform

W: witness

R : review

SW: spot witness

Supervision work for tank erection




Check drawing and check materials list, material take-off
check materials for upcoming activities
check when material deliver to site
check men power production welder,fitter,grinder,helper,lifting crew
Monitor work progress , welding progress
record down daily progress
Support workforce to speed up
Find the reason why progress is slow and report to manager

လုပ္ငန္း ကို အစမွ အဆံုးတိုင္



 အရည္အေသြး ရွိမႈ ဆိုသည္မွာ -
 လုပ္ငန္း ကို အစမွ အဆံုးတိုင္ သိျမင္
နားလည္ၿပီး ျပႆနာမ်ား ကို ေျဖရွင္း ႏိုင္ျခင္း ျဖစ္သည္။
 ႀကိဳးစား အားထုတ္မႈ -
ဆိုသည္မွာ အလုပ္ကို စြမ္းစြမ္း တမံ လုပ္ေဆာင္၍ အလုပ္ မ်ားမ်ား လုပ္သည္ႏွင့္
အမွ် မ်ားမ်ား တတ္ကြ်မ္း လာျခင္း ျဖစ္သည္။
 စည္းလံုး ညီၫြတ္မႈ ဆိုသည္မွာ အျခား -
သူမ်ား ႏွင့္ လိုလို လားလား ပူးေပါင္း ေဆာင္ရြက္ ရန္ အသင့္ရွိၿပီး
သိသင့္သည္မ်ား ကို တကယ္ လည္း သိေအာင္ သတင္း ဖလွယ္ျခင္းတို႔ ျဖစ္ သည္။
  
  မည္သည့္ အဖြဲ႕အစည္းတြင္ မဆို ရင္းျမစ္ ပိုင္ဆိုင္မႈမ်ား ရွိသည္။
ပိုင္ဆိုင္သည့္ ရင္းျမစ္ ငါးမ်ိဳးမွာ ေငြေၾကး၊ လူသား အရင္းအျမစ္မ်ား၊ ရရန
္အေၾကြးမ်ား၊ သတင္းမ်ား ႏွင့္ အတတ္ပညာ ဆိုင္ရာ ပစၥည္း ဥစၥာမ်ား ျဖစ္သည္။
       ေခါင္းေဆာင္၏ တတိယ အလုပ္မွာ ကုမၸဏီ ၏ ပိုင္ဆိုင္မႈ ရင္းျမစ္မ်ားက
စီမံခန္႔ခြဲေရး ပင္ ျဖစ္သည္။ ဤသည္မွာ ေခါင္းေဆာင္၏ အေရးႀကီးဆံုး တာဝန္ ျဖစ္သည္။
ေခါင္းေဆာင္ သည္ သူ ကြ်မ္းက်င္သည့္ လုပ္ငန္းကို ကိုယ္တိုင္ လုပ္ရန္ မဟုတ္ဘဲ
စီမံ ခန္႔ခြဲ ရန္သာ ျဖစ္သည္။

Project Knowledge



Observe Hazard analysis and Risk Assessments with regards to the Safety issues. 
Enforcing and implementing the Safe working procedures at site. 
Accompanied in the Weekly Planned Group Inspections conducted by the clients. 
Develop the Safe Working procedures for all items of work with reference to method Statement. 
Arranging the method Statement for the Safety Group meetings with the Sub Contractors. 
Advice the site management employees on Health, ...

keep monitoring safety activities

You will be based at site and you will be required to meet certain deadlines, as well as liaise with various sub contractors, and coordination on different aspects of the project. Coordination on the site activities, construction and subcontractor. Preparing and Arranging of Panel Data to be submitted to Client. Ma ..

in accordance with applicable code/standard, engineering guides, specification and government regulation. Inspect for any deviation and take necessary corrective action in term of repair recommendation, record /file properly. Ensure all civil and structural work comply with the ...

He/She shall have a minimum of ten (10) years experience in offshore, oil and gas production facilities of which the last three (3) years must have been in commissioning superintendent role during which time he/she has been leading commissioning activities of major offshore oil and gas projects. ...

Assist Project Manager in planning and execution of project plans at site. Liaison with all parties involved in the project including local authorities, consultants, clients, subcontractors and suppliers. Attend site meetings and inspections, report regularly on progress and monitor schedule. Prepare and monitor work schedules, project costing, procurement, and coordination with all partied involved to ensure work progress smoothly and complet ...


Job Title: General Manager Job Description • Responsible for the smooth operation of the Company as well as the overall performance. • Involve in the general management, business strategy, budgeting, financial control, operations, It, HR,etc • Ensure effective management and control of operations and business practice. • Develop strategic business and marketing plans to grow the business existing accounts and acquire new businesses and pot ...